STREET-LEGAL CART SHOWDOWN · SLCS · CENTRAL FLORIDA · How we make money — dealers pay for introductions; no brand pays for rank.

Denago EV CITY vs. Bintelli Sivo Edge 4F Lifted

By The Smith Family, reviewed by Brad · Independent, no paid placement · Last verified Oct 8, 2026

WinnerBintelli Sivo Edge 4F Lifted

Bintelli Sivo Edge 4F Lifted takes it. It wins on the better price. The full side-by-side of verified specs is below — every figure carries a source and a verification date.

Key takeaways

  • The Bintelli Sivo Edge 4F Lifted beats the Denago EV CITY on the better price.
  • Florida out-the-door (6% state sales tax + ~1% county surtax on the first $5,000, FLHSMV title + initial registration): the Denago EV CITY lands about $17,842 and the Bintelli Sivo Edge 4F Lifted about $15,717, base build before kits and dealer-quoted delivery.
  • Both the Denago EV CITY and the Bintelli Sivo Edge 4F Lifted are factory-certified LSVs, confirmed against the NHTSA vPIC registry.

Head to head · Central Florida Edition

Denago EV CITY vs. Bintelli Sivo Edge 4F Lifted

COMPARISON · DENAGO-CITY-VS-SIVO-EDGE-4F-LIFTED
LAST VERIFIED 10/08/2026
Denago EVCITYBintelliSivo Edge 4F LiftedWinner
Price range$16,500dealer-quoted MSRP$14,495maker's store price
Top speed25 mph†125 mph†2
Range (low)40 mi†1—
Battery typelithium†1lithium†3
Battery capacity205 Ah†1—
System voltage51.2 V†1—
Seats6✓†14†2
Length150 in†4122.4 in†2
Width74 in†448 in†2
Height78 in†480.4 in†2
Curb weight1,719 lb†4—
Motor power5 kW†15 kW†2
Brakes4-wheel disc†1Four-wheel hydraulic†3
SuspensionIndependent front and rear†1Front: Independent; Rear: Coil Spring-Hydraulic Shock†2
Display size—10.1 in†2
Warranty2 yr†12 yr†5
Battery warranty (total term)8 yr†18 yr†5
LSV certified (street-legal capable)Yes†1Yes†6
Charge time5 hr†1—
Ground clearance—9.3 in†2
Turning radius—18 ft†2
Range, normalized◆ computed~84 mi—

◆ Range, normalized is our figure, not the maker's: each pack's energy at a standard 0.125 kWh/mile, the same on every cart — an apples-to-apples check on the “up to” range claims above, which are usually measured at 19 mph on the largest optional pack.

†1 SOURCE: denagoev.com · VERIFIED 07/30/2026†2 SOURCE: sivogolfcarts.com · VERIFIED 10/08/2026†3 SOURCE: bintelligolfcarts.com · VERIFIED 10/08/2026†4 SOURCE: denagomsv.com · VERIFIED 09/25/2026†5 SOURCE: sivogolfcarts.com · VERIFIED 10/08/2026†6 SOURCE: vpic.nhtsa.dot.gov · VERIFIED 10/08/2026

◆ The verdict

Bintelli Sivo Edge 4F Lifted

It wins on the better price.

Save $2,005 vs the Denago EV CITY

Winner

Why it won

price$14,495 vs $16,500

◆ Price the fight — Florida out-the-door

Florida out-the-door estimates (6% state sales tax + ~1% county surtax on the first $5,000, FLHSMV title + initial registration): the Denago EV CITY lands at about $17,842 and the Bintelli Sivo Edge 4F Lifted at about $15,717, base build, before kits and dealer-quoted delivery.

Denago EV CITYbase build · FL out-the-door

Denago EV CITYMSRP as a dealer lists it (the maker publishes none), read Oct 20, 2026$16,500.00
FL sales tax (est.)6% state + 1.0% county surtax on the first $5,000$1,040.00
Title + initial registration (est.)FLHSMV: $77.25 new title + $225 one-time initial registration$302.25
DeliveryQuoted by the dealer — we never guess this number—
Out-the-door estimate$17,842

est. $286.02/mo — 20% down, 7.5% APR, 60 mo. Confirm real rates with the lender.

Bintelli Sivo Edge 4F Liftedbase build · FL out-the-door

Bintelli Sivo Edge 4F LiftedPrice at the maker's own store, read Oct 8, 2026$14,495.00
FL sales tax (est.)6% state + 1.0% county surtax on the first $5,000$919.70
Title + initial registration (est.)FLHSMV: $77.25 new title + $225 one-time initial registration$302.25
DeliveryQuoted by the dealer — we never guess this number—
Out-the-door estimate$15,717

est. $251.95/mo — 20% down, 7.5% APR, 60 mo. Confirm real rates with the lender.

METHODOLOGY — what's verified, what's estimated
Cart price and kit prices are sourced and dated — the cart line says whether its price is the maker's MSRP or a dealer's listed price. Tax = 6% FL state + 1% county surtax on the first $5,000 (Fla. Stat. §212.05 / §212.054 — surtax varies by county). Fees = $77.25 FLHSMV new title + $225 one-time initial registration. Plate/annual registration vary by weight and county and are small. Delivery is quoted by the dealer — we never guess it. Your firm number comes from the named dealers in the quote step.
Compared & SourcedVERIFIED 10/2026

Green ✓ marks the better verified figure where the two differ. Verdict scored on the verified specs above — factory-LSV status gates the win.

Rather skip the configurator? Get a dealer quote on either cart:

Frequently asked

Is the Denago EV CITY or the Bintelli Sivo Edge 4F Lifted better?
Bintelli Sivo Edge 4F Lifted takes it. It wins on the better price.
What do the CITY and Sivo Edge 4F Lifted cost out the door in Florida?
Florida out-the-door estimates (6% state sales tax + ~1% county surtax on the first $5,000, FLHSMV title + initial registration): the Denago EV CITY lands at about $17,842 and the Bintelli Sivo Edge 4F Lifted at about $15,717, base build, before kits and dealer-quoted delivery. Each cart price is sourced and dated — the maker's MSRP where one is published, otherwise a dealer's listed price, labeled on the ledger; taxes and fees are labeled estimates with the method disclosed. Configure both carts with kits at golfcartshowdown.com/build/compare.